Langosteira Outer Harbor - Phase III
During the period 2008-2009 AQUATICA INGENIERIA was a collaborating company in the draughting of LANGOSTEIRA OUTER HARBOUR, PHASE III.
AQUATICA INGENIERÍA has great experience in providing port and coastal engineering services in the following areas:
AQUATICA developed the following works for CALTIA INFRAESTRUCTURAS
In February 2008, Aquática Ingeniería was hired by the Moroccan National Ports Agency (ANP) to solve operational problems in the port of Sidi Ifni, since the entrance channel suffered landfill problems that challenged ship entry.