Project 1

Health and Safety coordination for hydraulic works

AQUÁTICA performs for the Public Business Entity Augas de Galicia the “Development of prevention and business coordination actions in the province of Pontevedra” as Technical Assistance and Coordination and Health and Safety. Our scope is the construction of civil works: sanitation, supplies, as well as treatment plants, outfalls, pumps, dams, etc.

Coordinación de seguridad y salud obras hidráulicas
Coordinación de seguridad y salud obras hidráulicas
Coordinación de seguridad y salud obras hidráulicas
Coordinación de seguridad y salud obras hidráulicas

Project 2

Technical assistance for the port of Garachico

AQUATICA carried out the following works for the COMSA – CIES joint venture:

  • Study of maritime climate and recalculation of the height of design wave.
  • Agitation and resonance tests.
  • Detailed analysis of the overflow in the initial section of the dike.
  • Breakwater optimization.
  • Development of a wave forecast system.
A.T. a la construcción del puerto de Garachico
A.T. a la construcción del puerto de Garachico
A.T. a la construcción del puerto de Garachico

Project 3

Curtis industrial estate works management

AQUÁTICA INGENERIA was responsible for the Construction Management of the Second Phase of the Curtis Teixeiro Industrial Estate, for SEPES (Public Business Entity for Land Management).

Dirección de obra polígono industrial de Curtis

Project 4

Technical assistance Breiro River and TDUs collector improvement

AQUATICA was in charge of the Technical Assistance for the Improvement of the Breiro River Collector, rainwater removal and TDUs installation in Boiro.

The works ranged from geometric control of the work, execution management, technical reports to study of alternatives.

A.T. Mejora de colector del río Breiro y TDUs
A.T. Mejora de colector del río Breiro y TDUs
A.T. Mejora de colector del río Breiro y TDUs

Project 5

Works management of the Royal Nautical Club Vigo marina

AQUATICA carried out the Construction Management of the new marina of the Real Club Náutico de Vigo located in the city center.

The works included demolition of the old docks and the installation of floating pontoons with water and electricity services. It currently houses about 300 mooring posts.

Dirección de obra de la marina de RCN Vigo

Project 6

Technical assistance Consolidation and Reinforcement of the Ons Island Pier

AQUATICA carried out the Technical Assistance for the consolidation and reinforcement of the Ons pier.

It is a stonework pier that has been suffering severe damage that has resulted in big holes on the inside.

The work was aimed at improving the structure and grout injections.

A.T. Consolidación y Refuerzo del Muelle de la isla de Ons
A.T. Consolidación y Refuerzo del Muelle de la isla de Ons

Configuración de cookies

Este sitio web utiliza cookies para mejorar la experiencia mientras se navega por el sitio web. Las cookies que se clasifican como necesarias se almacenan en el navegador ya que son esenciales para el funcionamiento básico del sitio web. También utilizamos cookies de terceros que nos ayudan a analizar y comprender cómo utilizas este sitio web; estas cookies se almacenarán en tu navegador sólo con tu consentimiento. También tienes la opción de no permitir estas cookies, sin embargo, la exclusión de algunas de estas cookies puede afectar a tu experiencia de navegación.

Instrucciones sobre cómo eliminar las cookies y más información en nuestra política de cookies.